Project: Renovation and extension of the district court, Wengistrasse 30, 8004 Zurich
Task: Preventively reinforce the load-bearing capacity of the subsoil to absorb higher loads
Client: Canton of Zurich Building Department, Stampfenbachstrasse 110, 8090 Zurich
-
Project: Conversion of Solothurn City Theater, Theatergasse 18, 4500 Solothurn
Task: Preventively reinforce the load-bearing capacity of the subsoil to absorb higher loads
Client: City of Solothurn, Stadtbauamt, Baselstrasse 7, 4500 Solothurn
-
Project: Training center for technology, 8510 Frauenfeld
Task: Preventively reinforce the load-bearing capacity of the subsoil to absorb higher loads
Client: Cantonal Building Office Thurgau, 8510 Frauenfeld
-
Project: Conversion/new building Swiss Film Archive, Chemin de la Vaux 2, 1303 Penthaz
Task: Stopping the progressive settlement of the longitudinal side of the building
Client: Federal Office for Buildings and Logistics, Holzikofenweg 36, 3003 Bern
-
Project: Apartment building, Hänibüel 14, 6300 Zug
Task: Stopping the progressive settlement of the façade wall on the valley side
Client: Condominium owner Hänibüel 14, 6300 Zug
-
Project: Auenstein Castle, Unterdorf 7, 5105 Auenstein
Task: Stopping the progressive subsidence of the attached staircase
Client: REBAG AG, Unterdorfstrasse 7, 5105 Auenstein
-
Project: School extension Landschlacht, Schulstrasse 25, 8597 Münsterlingen
Task: Preventive improvement of the building site to accommodate higher loads
Client: Münsterlingen primary school community, Schulstrasse 6, 8596 Scherzingen
-
Project: Casa Romagnolo, Via Sassello 18, 6723 Marolta
Task: House with 340 years of history: stopping progressive subsidence
Client: Felix Bommer and Franziska Windlin, Lindenfeldsteig 14, 6006 Lucerne
-
Project: Conversion of Nestlé Museum into administration building for Nespresso,1800 Vevey
Task: Preventive improvement of the building ground to accommodate higher loads
Client: Société des Produits Nestlé SA, Avenue Nestlé 55, 1800 Vevey
-
Project: Arbor of the old town hall, Bahnhofstrasse 167, 8620 Wetzikon
Task: Stopping the progressive subsidence
Client: City of Wetzikon, Real Estate Department, Bahnhofstrasse 167, 8620 Wetzikon
-
Project: Extension to detached house, Brunnerstrasse 17, 8405 Winterthur
Task: To stop the progressive leaning of the extension
Client: Martin Camenisch, Brunnerstrasse 17, 8405 Winterthur
-
Project: Property Hottingerstrasse 11, 8032 Zurich
Task: To stop the progressive subsidence of the 5-storey building
Client: Medizinische Laboratorien Dr. F. Käppeli AG, Hottingerstrasse 9, 8032 Zurich
-
Project: MGB Matterhorn Gotthard Bahn, Warehouse C, Tunnelstrasse 200, 3900 Brig
Task: Restore base stress in sunken individual foundations
Client: Matterhorn Gotthard Infrastruktur AG, Bahnhofplatz 7, 3900 Brig
-
Project: Single-family house, Hauptstrasse 11a, 8919 Rottenschwil
Task: Raise the building in several stages by a total of 18 cm from its inclined position
Client: Iwan Flury, Hauptstrasse 11a, 8919 Rottenschwil
-
Project: Schiffländi retirement center, Bahnhofstrasse 15, 5722 Gränichen
Task: Raise 4-storey extension by 6 cm from the inclined position
Client: Schiffländi retirement center, Bahnhofstrasse 15, 5722 Gränichen
-
Project: Single-family house, Schochenmatte 38, 6063 Stalden
Task: Lifting the building 14 cm out of its inclined position
Client: Thomas Spitzmüller Architekturbüro, Schribersmattweg 17, 6074 Giswil
-
Project: Chalet Bärefalli, Kirchbühlstrasse 2, 3818 Grindelwald
Task: To lift the building 20 cm out of its inclined position
Client: Condominium owner Chalet Bärefalli
c/o Fankhauser & Thomi Immobilien GmbH, Dorfstrasse 123, 3818 Grindelwald
-
Project: Conversion and modernization of Coop Silbern, Silbernstrasse 9, 8953 Dietikon
Task: Seal the pit in the groundwater with a sealing wall and sealing base, for the construction
of a lift underpass with sunk steel pipes to accommodate the lift hydraulic cylinders
Client: Coop Immobilien, Silbernstrasse 1, 8953 Dietikon
-
Project: ARA Buholz, Rothenburg pumping station, Buholzstrasse 32, 6032 Emmen
Task: Seal the annular space between the sheet pile wall and the existing sewer below the groundwater level so that the sheet pile wall can be opened and a connecting tunnel can be built to the existing sewer
Client: Anliker AG Bauunternehmung, Meierhöflistrasse 18, 6021 Emmenbrücke
-
Project: Coop excavation pit, Rue du Temple 8, 1180 Rolle
Task: Stopping the flow of water through open diaphragm wall joints
Client: Implenia Suisse SA, Alain Coudrier, Chemin de l'Echo 1, 1213 Onex
-
Project: A9 highway, covered cut in Raron, 3942 Raron
Task: Seal drainage filter (Ø 100, 24 m deep) at a depth of 12 - 14 m
Client: Canton of Valais, Office for National Road Construction, Kantonsstrasse 275, 3902 Glis
-
Project: Musée Olympique, quai d'Ouchy 1, 1006 Lausanne
Task: Seal excavation pit for elevator shaft against groundwater inflow
Client: IOC, Château de Vidy, 1007 Lausanne
-
Project: Conversion of Hotel Eden au Lac, Utoquai 45, 8008 Zurich
Task 1: Underpinning the longitudinal façade wall along the neighboring excavation Task 2: Reduce groundwater flow under the strip foundation Client: Swiss Hospitality Properties AG, Höheweg 39 - 49, 3800 Interlaken
-
Project: Replacement construction of 3 apartment buildings, Schaffhauserstrasse 307, 8050 Zurich
Task: Seal 15 geothermal probe boreholes against artesian seepage
Client: Hans Barmettler & Co AG, Bruno Barmettler, Gwärbi 325, 5054 Mooslerau